Hauptgebäude Basalt AG | © Basalt AG

00:00 - 23:59

Hauptgebäude der Basalt AG

Linzhausenstraße 20, 53545 Linz am Rhein

Historic building by the architects Heinrich Mattar and Eduard Scheler

Numerous buildings in Linz were planned by the architects Heinrich Mattar and Eduard Scheler, who had offices in Cologne, Munich and Linz on the Rhine. From 1913 to the mid-1950s, administration buildings, factories, villas and residential buildings with characteristic architecture were built here. The main client in Linz was Basalt-Actien-Gesellschaft, founded in 1888, which was the most important employer in the region at the time. In 1922, the impressive head office of the BAG was completed on Linzhausenstrasse. All architectural parts in the outer area of the monumental neo-baroque building with a mansard roof are made of basaltine, the artificial stone produced by the BAG. The south-east facade facing the station is dominated by imposing columns, on the Rhine side two huge tritons guard the wide flight of stairs to the main portal with balcony. Inside the building, filigree ceiling paintings and pillars and door frames covered with marble-like artificial stone are impressive.

Hauptgebäude Basalt AG | © Basalt AG
Hauptgebäude Basalt AG 2 | © Basalt AG
Hauptgebäude Basalt AG 3 | © Basalt AG

Hauptgebäude der Basalt AG

From17.01.2023 until the 17.01.2060

Opening hours:
Monday: 00:00Clock to 23:59Clock
Tuesday: 00:00Clock to 23:59Clock
Wednesday: 00:00Clock to 23:59Clock
Thursday: 00:00Clock to 23:59Clock
Friday: 00:00Clock to 23:59Clock
Saturday: 00:00Clock to 23:59Clock
Sunday: 00:00Clock to 23:59Clock

Um diesen Inhalt zu sehen müssen Sie den Drittanbieter Cookies zustimmen.

53545 Linz am Rhein Linzhausenstraße 20
Basalt-Actien-Gesellschaft
Linzhausenstraße 20
53545 Linz am Rhein

Phone: (0049) 2644 5630
E-mail: info@basalt.de
Web: http://www.basalt.de

Plan route